TRCA Stouffville Dam Repairs Design Project

Sticky

The project located in Stouffville, Ontario. The owner is Toronto and Region Conservation Authority (TRCA). Fordes Engineering was retained as prime consultant to design, tender, and inspect the project. The

Howson Dam Project in Wingham Ontario

The project located in Wingham, Ontario. The owner is the Township of North Huron. Fordes Engineering and Chant Ltd provided site inspections/investigations, assessment/evaluation, engineering solutions for this project. The works included

LPRCA Hey Creek Dam Project

The Hay Creek Dam was originally constructed in 1967. It is located 5 km west of Port Dover, Norfolk County, and is approximately 3 km west of its outlet at

1195 Newmarket Street Ottawa – Warehouse Project

The project is a 11000m2 warehouse design and located in City of Ottawa. Fordes Engineering has been involved with Site Grading and Drainage Plan, Site Servicing Plan and Functional Servicing

Hudbay Dam Safety Review Project

The work was completed by means of a review of background information and data, a site inspection and interviews with site staff and an assessment of the information collected. This

344 Irene Drive, Keswick ON – Craw Space Foundation Treatment Design

The house foundation was damaged and deformed by the frost ground around the house in winter. The problem leads to many of the safety and stability issues with the house.

106 Woodbridge Ave Vaughan ON Parking Study Project

Fordes Engineering carried out parking study on behalf of the client for the application of parking permit of the proposed eating business based on the City’s By-law 1-88 (Vaughan). The

34 Wildwood Ave Richmond Hill ON Sediment Control Project

The proposed construction of the single two-storey house is located at 34 Wildwood Avenue, Richmond Hill, ON. The site sheet flows to North Lake Road and Wildwood Avenue to the