The proposed construction of the single two-storey house is located at 34 Wildwood Avenue, Richmond Hill, ON. The site sheet flows to North Lake Road and Wildwood Avenue to the roadside ditch of Wildwood Ave and ultimately to Wilcox Lake. Fordes Engineering prepared the erosion and sediment control (ECA) plan to get permitting application for preventing sediment migration to the existing conveyance system during the construction activities.

Explore More

344 Irene Drive, Keswick ON – Craw Space Foundation Treatment Design

The house foundation was damaged and deformed by the frost ground around the house in winter. The problem leads to many of the safety and stability issues with the house.

106 Woodbridge Ave Vaughan ON Parking Study Project

Fordes Engineering carried out parking study on behalf of the client for the application of parking permit of the proposed eating business based on the City’s By-law 1-88 (Vaughan). The

LPRCA Hey Creek Dam Project

The Hay Creek Dam was originally constructed in 1967. It is located 5 km west of Port Dover, Norfolk County, and is approximately 3 km west of its outlet at