The work was completed by means of a review of background information and data, a site inspection and interviews with site staff and an assessment of the information collected. This Audit Dam Safety Review was to provide the client for the future work and decisions based on the review results. Our principle engineer was a main team member for the project.

Explore More

344 Irene Drive, Keswick ON – Craw Space Foundation Treatment Design

The house foundation was damaged and deformed by the frost ground around the house in winter. The problem leads to many of the safety and stability issues with the house.

106 Woodbridge Ave Vaughan ON Parking Study Project

Fordes Engineering carried out parking study on behalf of the client for the application of parking permit of the proposed eating business based on the City’s By-law 1-88 (Vaughan). The

LPRCA Hey Creek Dam Project

The Hay Creek Dam was originally constructed in 1967. It is located 5 km west of Port Dover, Norfolk County, and is approximately 3 km west of its outlet at