The house foundation was damaged and deformed by the frost ground around the house in winter. The problem leads to many of the safety and stability issues with the house. Fordes Engineering carried out the crawl space foundation repair treatment and frost protection design.

Explore More

Hudbay Dam Safety Review Project

The work was completed by means of a review of background information and data, a site inspection and interviews with site staff and an assessment of the information collected. This

Howson Dam Project in Wingham Ontario

The project located in Wingham, Ontario. The owner is the Township of North Huron. Fordes Engineering and Chant Ltd provided site inspections/investigations, assessment/evaluation, engineering solutions for this project. The works included

34 Wildwood Ave Richmond Hill ON Sediment Control Project

The proposed construction of the single two-storey house is located at 34 Wildwood Avenue, Richmond Hill, ON. The site sheet flows to North Lake Road and Wildwood Avenue to the